11 wks
median delivery, compared to 14–18 months on a Big-4 quote
60%
lower cost on the same scope, saving passed to you not us
23
undocumented fields found in week one on an ASX-200 modernisation
100%
of code human-reviewed — every line attributable to an agent, prompt, and model
The core problem
Every failed modernisation project has the same archaeology problem. The documentation describes the system as it was designed — not as it runs. The developers who understood the hardest corners left years before the rebuild began. Migration scripts were written by hand from that incomplete picture and failed at cut-over because fields the documentation never mentioned were silently load-bearing.
An ASX-200 manufacturer had tried the rebuild twice. Every prior attempt stalled at data migration. Effektiv's Diagnose phase found twenty-three undocumented fields in the first week — by reading the data, not the spec. Eleven weeks later the new system was in production at $560K against a $1.4M Big-4 quote.
What changes
Without Effektiv
With Effektiv
How we deliver
Two weeks of listening before a line of code. The price is fixed at the end of Design — not at kick-off.
Phase 1 · 1–2 weeks
AI agents read the full codebase and map the flows. We audit what the documentation says versus what the code and data actually do. The twenty-three-field problem at the ASX-200 manufacturer was found here — in the data, not at cut-over.
Phase 2 · 1–2 weeks
A rebuild plan shaped to what Diagnose found, the cut-over strategy, and the outcome contract. The rollback plan is specified here — not improvised on the night. The price agreed at the end of Design is the price on the invoice.
Phase 3 · 9–14 weeks
Migration scripts written and re-run by AI agents against a model copy of your stack. Senior pair reviews every step against the eval rig. The cut-over is rehearsed in the model copy before any production data moves. Your team owns the system at exit.
Quality gates
Every output passes a multi-gate evaluation before it merges or ships. Outputs that fail do not proceed. The eval rig and all gate code are yours at exit.
Eval rig · sample run
Eval rig source code shipped to your repo at exit.
Sample engagement
An ASX-200 manufacturer needed to move from a legacy ERP stack. Two prior rebuild attempts had stalled at data migration. Diagnose found twenty-three undocumented fields driving those failures. The rebuild ran 11 weeks at $560K against a $1.4M Big-4 quote. 68% of code was AI-written; 100% human-reviewed. The client team ran the cut-over solo by week nine.
Read the full case →
Compliance posture
ISO 27001 in progress (Q3 2026) ISO 42001 aligned NIST AI RMF mapped IRAP path Q4 2026 Full governance posture →Other services
Service
RPA and ESB out, agent mesh in. Run cost down 50–70%.
Read more →Service
With-you mode. Your team ships AI without us in 90 days.
Read more →Service
Custom products and greenfield software, shipped in 8–14 weeks.
Read more →Service
AI in the alert path. 50–70% drop in human-paged incidents.
Read more →Service
AI helpers that draft for human review. Brand-voice eval gated.
Read more →Common questions
Outcome-priced from day one
Show us a previous quote or a project scope. We price the same work on outcomes — not hours — with AU governance and data sovereignty built in from the first architecture call.